Roberts Onsite is a Wholly Owned Subsidiary of Black & McDonald Limited
Email or call us at 1.800.265.8961 - 24 Hour Emergency Service

Home  >  Project Profiles  >  Rosehill Pumping Station for The City of Toronto

Rosehill Pumping Station for The City of Toronto

The City of Toronto - Rosehill Pumping Station

Roberts Onsite was contracted to perform this project in conjunction with J&B Engineering Inc.  Due to the nature and critical timeframe of this project, the work was separated into three phases.  The first phase required the existing 7-section 5KV switchboard to be split; half was removed and replaced with a new 3 cell section.  Two of the four 5KV – 1200HP pumps were reconnected to the new cells.  The second phase required the removal of the remaining original 4 cell section and tie switch, which was replaced with a new section and switch.  The remaining 2 5KV – 1200HP pumps were connected.  During the first two phases, all controls were redirected from the old cells to the new cells, then back to the existing SCADA panel.  The final phase required an additional 6 cell MCC to be installed for future services.

 

Want to know more?

Contact us today and find out how we can help!

Project Partners

J&B Engineering


Location

Toronto, ON


Markets Served


Trades & Services